Here are pictures of the construction of the railroad.

grrconstruction016.jpg

There is always leveling to be done!

gardenrailroad002.jpg

Track Sections to be put in

grrconstruction007.jpg

First day of ballasting.

gardenrailroad001.jpg

More trackwork.....

grrconstruction005.jpg

Putting in ballast.

grrconstruction013.jpg

Day 2 of ballasting

grrconstruction004.jpg

And still more ballast!

grrexpansion002.jpg

Then continue down the stright-a-way

grrconstruction020.jpg

Where the bridge will be installed.

grrconstruction024.jpg

Ballast work

grrconstruction028.jpg

Backfilling the abumbments.

tracksoldering002.jpg

Close-up of one of the soldered joints.

gardenrailroad009.jpg

The MOW car

grrconstruction011.jpg

More ballast!

grrexpansion001.jpg

Future Expansion...the curve will be taken out and the track will continue straight.

grrexpansion003.jpg

And loop back around at the end of the old garden railroad site

grrconstruction021.jpg

Josh starting the worst part of the bridge job, digging!

grrconstruction025.jpg

An more ballast work!

tracksoldering001.jpg

tracksoldering003.jpg

Jumper wires on each end.